Revamped Cryo Gas Plant Print E-mail

SCFM DELIVERS RESULTS

OUTCOME:
Gas Plant revamped and ready to ship in 24 weeks
 

The Customer Situation:
 
•    Customer would have to wait over one year to get a new cryo gas plant built
•    The customer had an old cryo gas plant that hadn’t been used in years
Challenges:
•   The old plant did not have a turbo compressor and unknown condition of the distillation tower, platefin exchanger and piping
•   
The old tower stored with the old plant did not match the plant design
•   
No existing drawings were available

     
  
Image
Before Rebuild
                                                                  


                                                                                           










                                                                                                           
Image
After Rebuild



                                                                                                  





                                           



 



The SCFM Solution:
•  Recreate a new plant using any components that would be cost effective
•  
Teardown the old plant prior to refurbishment
•  
Inspection took place while process design and drawings were progressing
•  
Work closely with the customer for approvals and progress reporting
•  
The plant design was modified to match the smaller received tower

The Results: 
The gas plant was completed within the 24 week time frame, including all new valving and instrumentation and updated control system